Sewage Treatment Plant
Dubai,
United Arab Emirates
The only Sewage Treatment Plant in all of Deira Islands is being built with PERI Formwork.
Location
The Project
Impressions from the project process
120 m long walls poured with TRIO wall formwork in one continuous pour
TRIO wall formwork is used on this project
The walls of this TSE Storage Tank are being poured with TRIO wall formwork
These walls are 6 meters high and stretch up to 120m long
Slabs are poured with GT24 girders and supported by PD8 shoring system
PD8 Shoring system is used for the slabs
CB Climbing formwork used with TRIO wall formwork for 12 m high walls
120 m long walls poured with TRIO wall formwork in one continuous pour
TRIO wall formwork is used on this project
The walls of this TSE Storage Tank are being poured with TRIO wall formwork
These walls are 6 meters high and stretch up to 120m long
Slabs are poured with GT24 girders and supported by PD8 shoring system
PD8 Shoring system is used for the slabs
CB Climbing formwork used with TRIO wall formwork for 12 m high walls
Mohammad Kraimesh
For fast track project and prompt usage of resources, we utilize TRIO system with professional support from PERI Sales & Engineering teams. Return of experience was optimum dealing with PERI Engineering & Sales teams. PERI solutions are always Fast, Safe and Reliable.