The Mersey Gateway is a cable-stayed bridge stretching over 2,000 m from Runcorn to Widnes

Infrastructure

Where smart engineering meets digital expertise

For over 30 years, we’ve been involved in delivering some of the UK’s most complex roads, tunnels and bridges. By using modern technology alongside our trusted temporary works systems, we help you deliver infrastructure that is built to last.

Infrastructure Projects

PERI supplied a project-specific formwork and scaffolding solution and supported with comprehensive engineering services for the construction of the 108-m-high complex dam on the River Tua in Portugal.
The 57° inclined run-off channel bottom plate and intermediate walls were constructed with concreting cycle heights of 2.40 m.
The Midfield Terminal Complex is the ultimate in construction sites: in order to maintain the tight construction schedule, PERI planned and delivered the formwork and scaffolding systems, and has provided yet another convincing performance through the competent engineering service and provision of huge quantities of materials at short notice.
The variable VARIO girder wall formwork, together with SKS climbing scaffold, formed large area transportable units.
More than 12 months after starting the development work on the Panama Canal, the dimensions and the massive structural elements are clearly visible.
Rabat-Iteen Interchange
With the selected PERI formwork and scaffolding systems, the construction team was able to cost-effectively fulfil all requirements in spite of the tight construction schedule. The solutions developed by PERI engineers and the local site management, along with support provided by PERI specialists, contributed to efficient and problem-free construction.
120 m long walls poured with TRIO wall formwork in one continuous pour
The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
In 25 m long concreting steps and four cycle sequences, the tunnel bottom plate, two wall sections respectively and then the slab could be concreted one after the other.
Zahid Business Park