Potsdamer Platz
Berlin, Germany
Office, business and residential buildings and regional train station as reconstruction in the centre of Berlin
Finished at the end of 1998
Location
Project participants
Customer: ARGE Müller Altvatter, C. Baresel AG, Cubiertas Y MZOV, Max Bögl GmbH & Co. KG, Alpine Bau Deutschland GmbH
The Project
Impressions from the project process
The Potsdamer Platz is a city of the future with office and residential buildings, schools, theatres, hotels and shopping centres in the heart of Berlin.
A short construction schedule required a formwork and scaffolding manufacturer who was able to provide the huge amounts of materials in a very short time.
With only one frame size, all utilization heights could be easily planned and efficiently scheduled without the use of separate combination tables.
Connected with MRK frames, the MULTIPROP individual props can be used as tables or shoring towers.
Highly adaptable MULTIFLEX slab formwork with GT 24 girders.
PERI provides formwork and scaffolding systems for every application. Here, HD 200 heavy-duty props in the lower section and MULTIPROP slab props with MRK frames at the top.
Climbing formwork with FB 180 climbing brackets and TRIO wall formwork.
SB brace frame with TRIO wall formwork in use for the single-sided forming of an 8.10 m high wall.
The Potsdamer Platz is a city of the future with office and residential buildings, schools, theatres, hotels and shopping centres in the heart of Berlin.
A short construction schedule required a formwork and scaffolding manufacturer who was able to provide the huge amounts of materials in a very short time.
With only one frame size, all utilization heights could be easily planned and efficiently scheduled without the use of separate combination tables.
Connected with MRK frames, the MULTIPROP individual props can be used as tables or shoring towers.
Highly adaptable MULTIFLEX slab formwork with GT 24 girders.
PERI provides formwork and scaffolding systems for every application. Here, HD 200 heavy-duty props in the lower section and MULTIPROP slab props with MRK frames at the top.
Climbing formwork with FB 180 climbing brackets and TRIO wall formwork.
SB brace frame with TRIO wall formwork in use for the single-sided forming of an 8.10 m high wall.