Parco della Musica e della Cultura
Florence, Italy
Group of buildings with opera house (1,800 seats), concert hall (1,100 seats) and theatre (2,000 seats)
Construction period: 2010 - 2012
Location
Project participants
Customer: Società Consortile parco della Musica a.r.l.
Architect: ABDR Architects
Architect: ABDR Architects
The Project
Impressions from the project process
The complex includes a 1,800-seat opera house, a concert hall for 1,100 music lovers as well as a theatre for audiences up to 2,000.
The PERI UP Rosett modular scaffolding was used as shoring and working scaffold. PERI UP Rosett nodes at 50 cm spacings provided connecting possibilities in all directions. In those areas with particularly high loads, the legs were bundled together by means of 25 cm long ledgers in 25 cm increments.
The large room heights and numerous wall and slab offsets placed high demands on the geometrical adjustment of the supporting structures.
MULTIPROP props were connected with MRK frames to form a dedicated system and carried the concreting loads of the 120 cm thick walls safely into the ground.
A construction consisting of the PERI UP scafolding system, MULTIPROP system, SLS spindles and SRU walers served as temporary support for the individual steel girders.











The complex includes a 1,800-seat opera house, a concert hall for 1,100 music lovers as well as a theatre for audiences up to 2,000.

The PERI UP Rosett modular scaffolding was used as shoring and working scaffold. PERI UP Rosett nodes at 50 cm spacings provided connecting possibilities in all directions. In those areas with particularly high loads, the legs were bundled together by means of 25 cm long ledgers in 25 cm increments.

The large room heights and numerous wall and slab offsets placed high demands on the geometrical adjustment of the supporting structures.

MULTIPROP props were connected with MRK frames to form a dedicated system and carried the concreting loads of the 120 cm thick walls safely into the ground.

A construction consisting of the PERI UP scafolding system, MULTIPROP system, SLS spindles and SRU walers served as temporary support for the individual steel girders.
Project Information