ISET Tower
Yekaterinburg,
Russia
Residential and office building with 52 storeys, total height of 209 m
Circular structure with centrally-arranged core
Varying number and dimensions of elevator shafts within the core likewise with circular ground plan
Location
Main Application
Buildings
Project participants
Customer: Ekaterinburg-City, Ltd.
The Project
Impressions from the project process
The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
With the RCS rail climbing system, the external formwork safely climbs the circular building core from storey to storey using a rail-guded procedure. Level +1 is completely enclosed which guarantees efficient formworking operations and reinforcement work.
The elevator shafts are arranged in the centre of the building´s core. Due to the restricted dimensions, self-climbing ACS S shaft formwork is being used for these walls.
For the internal formwork of the circular-shaped core wall, a combination consisting of the ACS G and P versions are used – optimally adapted to suit the geometric conditions of the ISET Tower.
The RCS climbing protection panel completely encloses the building´s outer edges thus guarateeing safe working conditions for the construction team at all times.
The ISET Tower in Yekaterinburg is characterized by its external shape. PERI planned a comprehensive, crane-independent concept of the climbing formwork required on the elevator shafts and core walls, as well as the climbing protection panel on the building´s outer edges.
With the RCS rail climbing system, the external formwork safely climbs the circular building core from storey to storey using a rail-guded procedure. Level +1 is completely enclosed which guarantees efficient formworking operations and reinforcement work.
The elevator shafts are arranged in the centre of the building´s core. Due to the restricted dimensions, self-climbing ACS S shaft formwork is being used for these walls.
For the internal formwork of the circular-shaped core wall, a combination consisting of the ACS G and P versions are used – optimally adapted to suit the geometric conditions of the ISET Tower.
The RCS climbing protection panel completely encloses the building´s outer edges thus guarateeing safe working conditions for the construction team at all times.
Project Information
We decided to use the proven PERI self-climbing formwork systems, because they are easy to handle and ensure complete safety in high-rise construction. PERI specialists have consistently provided us with operational support.
Golovin Evgeniy Borisovich
Chief Engineer