The Project
Impressions from the project process
Project Information
![Milan Jerábek, Construction Manager](https://cdn.peri.cloud/.imaging/lPortrait/dam/815f0e56-f6b5-4769-ab6b-b679cce9e388/84868/milan-jer%C3%A1bek-construction-manager.jpg)
![Milan Jerábek, Construction Manager Milan Jerábek, Construction Manager](https://cdn.peri.cloud/.imaging/lPortrait/dam/815f0e56-f6b5-4769-ab6b-b679cce9e388/84868/milan-jer%C3%A1bek-construction-manager.jpg)
Milan Jerábek
Construction Manager
The extremely tight construction time made it necessary to provide the whole formwork in total. PERI offered us a comprehensive solution with the GRV articulated waler formwork, PERI UP Rosett and MULTIPROP. We were able to erect the falsework in a very short time thanks to the PERI supervisor. It was absolutely right to decide in favour of PERI.
Are you working on a project like this?
Call us on +971 (0) 4 326 2992 to discuss your requirements further.
Location
Deer crossing bridge Zehun, Czech Republic
![Deer crossing bridge Zehun, Czech Republic - PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.](https://cdn.peri.cloud/.imaging/mWide/dam/72cd8d6d-f1d1-4e2f-8dc0-33c7bb4ebc18/84871/deer-crossing-bridge-zehun-peri-up-rosett-formed-the-falsework-construction-and-was-erected-according-to-the-type-test.jpg)
![Deer crossing bridge Zehun - PERI UP Rosett formed the falsework construction and was erected according to the type test Deer crossing bridge Zehun, Czech Republic - PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.](https://cdn.peri.cloud/.imaging/mWide/dam/72cd8d6d-f1d1-4e2f-8dc0-33c7bb4ebc18/84871/deer-crossing-bridge-zehun-peri-up-rosett-formed-the-falsework-construction-and-was-erected-according-to-the-type-test.jpg)