Albian Sands
Fort McMurray,
Canada
Production plant for the extraction of oil sand in an open pit mine.
Construction period: 2006-2010
Location
Main Application
Scaffolding
Project participants
Customer: Ledcor Industries, Fort McMurray
The Project
Impressions from the project process
Through the planning and supply of formwork and scaffolding from one source, the MULTIFLEX slab formwork and PERI UP shoring could be perfectly matched.
As side formwork for the enormous, up to 4 m high beams, TRIO panel formwork was used. PERI UP Rosett and MULTIFLEX formed the supporting structure.
With PERI UP Rosett and MULTIFLEX, the high loads from the massive structural elements at heights of between 10 m and 12 m were reliably transferred into the ground.
The PERI solution took into consideration the high requirements – static as well as in all aspects concerning safety.
Through the planning and supply of formwork and scaffolding from one source, the MULTIFLEX slab formwork and PERI UP shoring could be perfectly matched.
As side formwork for the enormous, up to 4 m high beams, TRIO panel formwork was used. PERI UP Rosett and MULTIFLEX formed the supporting structure.
With PERI UP Rosett and MULTIFLEX, the high loads from the massive structural elements at heights of between 10 m and 12 m were reliably transferred into the ground.
The PERI solution took into consideration the high requirements – static as well as in all aspects concerning safety.
Project Information
Denis Dubeau
Site Manager
There are many shoring systems and also a lot of working scaffold on the market. But PERI UP is the only system which equally satisfies both aspects. In particular, the high load-bearing capacity impressed me.
Interested in learning how PERI can support your next project?
Call us on +971 (0) 4 326 2992 to discuss your requirements further.
Location
Albian Sands, Canada