Al Falah Villas - Abu Dhabi, UAE
Abu Dhabi,
United Arab Emirates
- Residential villa complex
- Total of 899 villas
- Project start date: July 2019
- Completion date: November 2021
Location
Project participants
Customer: Trojan General Contracting
The Project
Impressions from the project process
Flexible scaffolding system for finishing works
Toe boards with lengths in the modular dimensions limit the decking areas.
Non-slip steel decking directly mounted to ledgers
Working scaffold highly adaptable with various desired widths
With few additional components such as console brackets or strengthened ledgers, complicated façade geometries can also be easily scaffolded.
Safe and fast assembly due to ledger with Gravity Lock
PERI UP Scaffolding optimally adapted to building geometry
PERI UP used for big number of villas
Flexible scaffolding system for finishing works
Toe boards with lengths in the modular dimensions limit the decking areas.
Non-slip steel decking directly mounted to ledgers
Working scaffold highly adaptable with various desired widths
With few additional components such as console brackets or strengthened ledgers, complicated façade geometries can also be easily scaffolded.
Safe and fast assembly due to ledger with Gravity Lock
PERI UP Scaffolding optimally adapted to building geometry
PERI UP used for big number of villas
Project Information
Eng. Mohamed Adnan Yassine
Project Manager
We were immediately impressed by PERI UP's multifunctional aspect. It can be used as external scaffolding as well as heavy duty shoring. Our team quickly adapted to the system which made operations on site go smoothly and more importantly, without any delays.