Project data

Location: Deira Islands, United Arab Emirates

  • Sewage Treatment Plant in Deira Islands
  • 4 main structures built with PERI
  • Duration: 18 months

Requirements

  • A formwork system that allows fast working operations
  • Walls of 120 m long to be casted in one continuous pour
  • A formwork system for 6-meter high columns

Customer

Butec

Sewage Treatment Plant
Mohammad Kraimesh
Construction Manager

"For fast track project and prompt usage of resources, we utilize TRIO system with professional support from PERI Sales & Engineering teams. Return of experience was optimum dealing with PERI Engineering & after sales. Fast, Safe, Reliable."

PERI solution

  • A total of 1,500 lm of walls casted with TRIO panel formwork
  • 6-meter high columns were formed with LICO 
  • PD8 shoring system used with GT24 girders to pour the slabs