Sohar Refinery Improvement Project - Oman

Project data

Location: Sohar, Oman

  • Only refinery in Sohar
  • Dead weight of the slab: 3500 tons
  • Project duration: 9 months
  • 31 m height and 986 m² slab area

Requirements

  • Shoring system required for big heights and high load-bearing capacity
  • Strong system to carry 2m slab thickness at 31m height
  • Stair case used for safe access to high level working areas

Customer

BEC - Bahwan Contracting Company 
Oman

Customer's benefit

  • System quick and easy to assemble
  • Reduced construction time on site
  • Easy to stack and transport
  • Simple adaptation to changing heights
  • Economical use in heavy structures
sohar-refinery-project-statement-project-manager-bec
Rejimon John - Ravi Kiran
Project Manager - Senior Project Engineer

We made the right choice with PD8 shoring system, especially that we had a main requirement for fast construction techniques in order to save time. It is easy to assemble the system in one place, it helped our team on site understand its connections quickly and imporve productivity. PD8 offers a much easier way of changing in the shifts as the structure grows higher. It is one of the main features that allows us to manage and construct this massive structure today, especially being safe and reliable throughout the construction period. We thank PERI for providing us the technical support needed and for their long association with us. 

PERI solution

  • PD8 shoring system erected on a clear height of 31 m
  • Shoring system supporting a slab thickness of 2 m
  • PERI UP Rosett Flex staircase for safe and easy access